Roadworks & S278 Works Contractors

ALERON is an experienced and accredited Roadworks & S278 Works Contractor

 

We work with developers, main contractors and local authorities, assisting with the development and delivery of adoptable road and highways infrastructure.

A Section 278 agreement (or S278) is a section of the Highways Act 1980 that allows developers to enter into a legal agreement with a Local Authority (the Highway Authority) to make permanent alterations or improvements to a public highway, as part of a new scheme development and construction process.

 ALERON employ teams of trained, experienced and qualified projects managers, works supervisors and site operatives carrying the highest level of NRSWA (New Roads and Street Works Act), CPCS, NPORS, SMSTS, SSSTS and CSCS qualifications.

HS2 Railway approved Roadworks, Highways and S278 Works Contractors

ALERON is one of only few HS2 approved Roadworks, Highways and S278 Works contractors. We have gained our accreditations and experience on a number of roadworks enabling schemes, road widenings,  traffic improvements and motorway upgrade projects delivered on behalf of the HS2 in the Southern section of HS2 Phase 1.   

 Examples of work covered by an S278 include:

  • New or changed access into a development site (i.e. a bell mouth, roundabout, signalised junction, right turn lane or a simple priority junction)
  • New or alteration of signalised crossings or junctions close to a development site
  • New or Remodelled Highway Construction
  • Junction Modifications & Roadworks
  • Roundabout Construction & Enhancement Schemes
  • Cycleway & Footpath Construction
  • Traffic Calming Measures
  • Hard & Soft Landscaping
  • Embankment Stabilization
  • Street Lighting & Signage

 ALERON help you with Section 278 Works

Work affecting the highway can only begin when all pre-commencement requirements listed in the S278 agreement have been met and approved by the Highway Authority.

As a competent and experienced Roadworks and S278 contractor, we work collaboratively to execute the requirements of Section 278 and Section 38 works within urban and rural environments.

 ALERON is responsible for all aspects of the works on the public highway, from the design through to supervising construction and ensuring that the works are completed to your satisfaction.

We work with all named parties to the S278 agreements at an early stage to offer all stakeholders a flexible approach to programming works to suit their requirements and timescales. These works involve liaising with various parties including the client, other contractors, statutory undertakers and affected stakeholders. 

ALERON also provide drainage/sewer and specialist groundworks services.

Speak to our specialists to get detailed advice regarding the entire process, including:

  •  Reviewing Scheme options
  • Developing and detailed Technical Design
  • Costings and Cost Engineering to meet your Budget
  • Gaining Approvals and Permissions from the Highway Authority
  • Managing Health & Safety
  • Construction Management
  • Performance of the Roadworks
  • Certificates and Compliance
enabling works

Call For a Quote:

01908 538138

Related Building Services

demolition

Demolition

Aleron Contractors is vastly proficient in undertaking demolition projects ranging from small houses to multi-storey structures.

bwic

BWIC – ‘Builder’s Work In Connection

Aleron Contractors have successfully delivered multimillion-pound BWIC projects over the last decade for several large national companies and have achieved preferred status with Tier 1 main contracts.

groundworks

Groundworks

Aleron Contractors has extensive experience in undertaking groundworks for both commercial and residential developments from paving to foundations.